With uniqueness as itsprime attribute, Variability is ever-presentin construction projects and must be managed effectively.
Variability canresult in fluctuating and unexpected conditions, making objectives unviable andobscuring the methods to achieve them. Further, Poor management can induceunnecessary changeability in construction conditions that leads to fluctuatingperformance (Thomas, 2002).